CDiTO Zamość

The Zamość hospital was established after the facility in Tomaszów Mazowiecki and set up a challenge for us. At the Investor’s request, our collaboration with the architect started at the stage of concept design. Having become familiar with the documentation, we designed a detailed layout of medical and non-medical equipment, based on the expertise we obtained in Tomaszów, and introduced the required corrections.

Our arrangement was presented to designers representing individual disciplines as a guideline which helped us avoid many coordination problems on the construction site.

We provided individual solutions for the type and deployment of lighting and the deployment of sockets required for arranging the interior. This is an example of a model solution that allows us to analyse details with people managing the project and introduce any required corrections, adopted to the needs of the staff and patients.